1. DMAIC :

Define, Measure, Analyze, Improve and Control in short referred as DMAIC. When it is fully implemented, ideates new process solution and problem solving approach. It is an improvement cycle which is a core tool used for driving six sigma rules. It makes the process easy for data driven cycle which improves, optimizes and stabilizes business process and design. Its an interconnected phase, where each step requires to ensure best possible result.  

The five steps in cyclic DMAIC process are :

  1. DEFINE
  2. MEASURE
  3. ANALYZE
  4. IMPROVE
  5. CONTROL

Disadvantages : 

Common criticism of DMAIC is that it is ineffective on communication framework. It always leaves audience confused and irritated. Also, a one size fits approach does not suites organization that relies on creativity. And when the goals is implemented in a certain new call monitor systems then DMAIC won’t work appropriately.

2. PDCA :

PDCA stands for Plan-Do-Check-Act. It is an iterative design which is a  management method used for various business purposes for their improvement, controlment and continuation of processes product. Originally developed by America Physicist Walter during 1920s. This is also called Deming cycle. Represents continuous loop of planning, doing, checking and acting. It provides simple and effective approach for solving problem and manages change. The model is useful for problem solving iterative techniques used to improve business-solving iterative technique used to improve business and processes..

PDCA consists four steps mentioned below :

  1. PLAN
  2. DO
  3. CHECK
  4. ACT

Disadvantages : 

Unspecific definition leads to a incorrect use. The Changes needed to be planned over longer period of time . With PDCA cycle, one needs to be considering ever accept and less proactively. Also, Makes ineffective tool for solving urgent problem Indulges multiple step that involves analysis and testing before the final outcome.

Let’s understand PDCA and DMAIC more clearly.

PDCA STEPS

PDCA

S.NO

DMAIC

DMAIC STEPS

PLAN Establishes objective and delivers product according to desired results and also works as per required processes. recognizes an opportunity and changes plans accordingly. 1 It is the 1st step which seeks identically all the pertinent information necessary to breakdown problems in project. It also focuses on business goals, budget, potential resources drives motivation and high level project timeline. DEFINE
DO Tests the changes. Functions on small scale study basis. The tasks are aligned and assessed, and carries out objectives from previous steps. 2 The main goal of the steps is to measure the specification of problems. It establishes process performance baseline. Its current process of activation and uses that for improvement of data which is compared MEASURE
CHECK During the check phase, the data and results are evaluated. Reviews tests , analyzes result. Formal and informal assessment takes place continually from daily assessment and annual standardized texts. 3 This phase examines data amassed ,validates and isolates the exact root in the process inefficiencies and defects. It extracts the main meaning. Prioritize the root cause which improves step. ANALYZE
ACT This step standardize when goals are met, improves the design curriculum and teaching method 3 This one initiates formal action plans which solves the targeted root problem which are raised during analyzation. Plans different variable isolation and co-factors until true obstacles are detected. Creates ,focuses on simplest and easiest solution also, deploy improvements. IMPROVE
    4 This step is to embed the changes and ensures sustainability, track improvement and gains approval to release resources. Helps in controlling plan, transition plans, control plan and provides delivery benefits.  CONTROL

Difference Between PDCA and DMAIC :

S.NO.

PDCA

DMAIC

01. PDCA is a repetitive 4 step stage model applied to achieve continuous improvement during business processes. DMAIC represents a data driven improvement approach which helps in improving ,enhancing and stabilizing the whole business process in 5 major steps.
02. PDCA is much simpler and more straightforward. DMAIC is likely more religious and detailed conceptional.
03. Runs on lean cycle procedure consisting 4 major steps. Works on six sigma principles consisting 5 steps.
04. Whereas, PDCA solves the overwhelming majority of problems. Its an effective way to solve bigger complex challenges.
05. PDCA cycle is inferior in that way. The six sigma rule is great way to drive through the process.
06. PDCA cycle performs on a quantitative and qualitative way. DMAIC provides an more detailed planning phase and plot.