The withYears() method of Period Class is used to obtain a period with specified number of years. This number of years is passed as the parameter as integer value.
Syntax:
public Period withYears(int numberOfYears)
Parameters: This method accepts a parameter numberOfYears which is the number of years to be changed in this Period.
Returns: This function returns a Period with the number of years passed as the parameter.
Below is the implementation of Period.withYears() method:
Example 1:
// Java code to demonstrate withYears() method import java.time.Period;
class GFG {
public static void main(String[] args)
{
// Get the String to be withYearsd
String period = "P1Y2M21D" ;
// Parse the String into Period
Period p = Period.parse(period);
System.out.println( "Period: " + p);
// Get the number of years
int numberOfYears = 5 ;
// Change the numberOfYears of this Period
// using withYears() method
System.out.println( "New Period: "
+ p.withYears(numberOfYears));
}
} |
Output:
Period: P1Y2M21D New Period: P5Y2M21D
Example 2:
// Java code to demonstrate withYears() method import java.time.Period;
class GFG {
public static void main(String[] args)
{
// Get the String to be withYearsd
String period = "-P1Y2M21D" ;
// Parse the String into Period
Period p = Period.parse(period);
System.out.println( "Period: " + p);
// Get the number of years
int numberOfYears = - 5 ;
// Change the numberOfYears of this Period
// using withYears() method
System.out.println( "New Period: "
+ p.withYears(numberOfYears));
}
} |
Output:
Period: P-1Y-2M-21D New Period: P-5Y-2M-21D
Reference: https://docs.oracle.com/javase/9/docs/api/java/time/Period.html#withYears-int-