Quality Assurance (QA) vs Quality Control (QC)

The article focuses on discussing the difference between Quality Assurance and Quality Control.

Quality Assurance

Quality assurance is a method of making the software application with fewer defects and mistakes when it is finally released to the end users. Quality Assurance is defined as an activity that ensures the approaches, techniques, methods, and processes designed for the projects are implemented correctly. It recognizes defects in the process. Quality Assurance is completed before Quality Control. 



Quality Control

Quality Control is a software engineering process that is used to ensure that the approaches, techniques, methods, and processes designed for the project are followed correctly. Quality control activities operate and verify that the application meet the defined quality standards. 

 
 
Below are the differences between Quality Assurance and Quality Control:



Parameters Quality Assurance (QA) Quality Control (QC)
Objective It focuses on providing assurance that the quality requested will be achieved. It focuses on fulfilling the quality requested.
Technique It is the technique of managing quality. It is the technique to verify quality.
Involved in which phase? It is involved during the development phase. It is not included during the development phase.
Program execution is included? It does not include the execution of the program. It always includes the execution of the program.
Type of tool It is a managerial tool. It is a corrective tool.
Process/ Product-oriented It is process oriented. It is product oriented.
Aim The aim of quality assurance is to prevent defects. The aim of quality control is to identify and improve the defects.
Order of execution It is performed before Quality Control. It is performed after the Quality Assurance activity is done. 
Technique type It is a preventive technique. It is a corrective technique.
Measure type It is a proactive measure. It is a reactive measure.
SDLC/ STLC? It is responsible for the entire software development life cycle. It is responsible for the software testing life cycle.
Activity level QA is a low-level activity that identifies an error and mistakes that QC cannot. It is a high-level activity that identifies an error that QA cannot.
Focus Pays main focus is on the intermediate process. Its primary focus is on final products.
Team  All team members of the project are involved. Generally, the testing team of the project is involved.
Aim It aims to prevent defects in the system.  It aims to identify defects or bugs in the system. 
Time consumption It is a less time-consuming activity. It is a more time-consuming activity.
Which statistical technique was applied? Statistical Process Control (SPC) statistical technique is applied to Quality Assurance. Statistical Quality Control (SQC) statistical technique is applied to Quality Control.
Example Verification Validation