Which of the following is not a maturity level as per Capability Maturity Model?
(A) Initial
(B) Measurable
(C) Repeatable
(D) Optimized


Answer: (B)

Explanation: There are 5 levels of Capability Maturity Model:

  • Level 1 – Initial
  • Level 2 – Repeatable
  • Level 3 – Defined
  • Level 4 – Managed (Capable)
  • Level 5 – Optimizing (Efficient)

So, option (B) is correct.